We take on a small number of homes each year, deliberately, each one designed around its owners, its light, and its land.
No pressure, no shortcuts. Just an honest standard of craft, held from the first drawing to the final walkthrough.
Sebby Homes designs and delivers contemporary custom residences across Dallas–Fort Worth: Highland Park, Preston Hollow, Southlake, Westlake, and Uptown. One team, one standard of finish.
Architecture, interiors, and budget resolved together before the first pour, not after.
Flush reveals, aligned grain, shadow-gap millwork, details most builders don't attempt.
One builder of record, one schedule, one point of contact through delivery and warranty.
Neighborhood-level knowledge of lots, codes, and what each street expects of a home.
I want to be straight about what you'd actually be getting for it.
Most builders sell quality as finishes: paint, cabinetry, the stuff you see on day one. For me the quality does not stop there; what actually matters even more is invisible: a tight envelope, water management, the mechanical systems designed before we break ground. That's what makes a home healthy, efficient, quiet, and still solid in 20 years.
I came up remodeling. I've opened too many walls to see what happens when that part gets skipped. The finishes are the easy part.
"I build for the part you can't see."
Designed around natural light by day, then layered cove and LED, statement fixtures, and landscape uplighting as the architecture comes alive at dusk.
White oak, matte black metal, natural stone, limewash plaster, large-format slab, materials chosen to be touched, not just seen.
"In a true custom build, you don't see the systems."
Linear slot diffusers flush to the ceiling. Concealed returns. No visible trim, no clumsy reveals. Audio, video, and climate integrated into the architecture. The engineering disappears. The architecture remains.
Open volume and clean rooflines. Kitchen and bath as sculpture: waterfall island, floating vanity, with smart climate and automation woven through the home.
Sebby Homes renovates homes across Dallas–Fort Worth: kitchens, primary suites and baths, additions and second stories, whole-home remodels, wine cellars, and backyards and front yards, held to the same standard as the custom homes we build from the ground up.
I came up remodeling. Before I built a single new home, I spent years opening walls in other people's houses, and that is where I learned what actually matters.
Behind a tired kitchen there is usually a bigger story: a missing vapor barrier, a duct run that was never sealed, a joist someone notched for a drain. A cosmetic remodel covers it back up. I don't.
When we open a wall, we fix what's behind it, then finish it to the standard of a new custom home.
"Open the walls once. Fix what's behind them."
On most kitchen, bath, and suite projects you stay in the house. The work area is sealed off, and you know which rooms stay usable, and when water and power are off, before demolition starts.
On whole-home remodels we tell you up front if moving out for part of the job is the better call. Either way, you follow every step in your six9 Builder portal.
Layout, cabinetry, stone, and appliances, plus the ventilation, electrical, and plumbing behind them.
See kitchensCurbless showers and floating vanities, with waterproofing done before tile, not hoped for after.
See bathroomsNew square footage that matches the original structure, roofline, and finish, so it never reads as added on.
Down to the studs where it needs to be: envelope, mechanical, electrical, plumbing, and every finish.
Outdoor kitchens, covered patios, hardscape, and landscape, built by the same team as the house.
Entries, walkways, driveways, lighting, and planting that give the house the arrival it deserves.
Glass-walled wine rooms and climate-controlled cellars, with insulation, vapor barrier, and cooling built in before the racking goes up.
See wine roomsArchitecture, interiors, and budget resolved as one, not in sequence.
Engineering, permits, selections, and a transparent build plan.
Disciplined site leadership, clean sites, and weekly owner updates.
The invisible-craft stage: millwork, systems, light, and detail.
Final walkthrough, systems training, and responsive warranty care.
Every Sebby build runs on six9 Builder, our proprietary client portal. Your schedule, phases, photos, and decisions live in one place, updated as the build moves. You'll never wonder where your home stands.
A phase-by-phase timeline, updated as trades confirm, not a printout that goes stale.
Progress photos and plain-English notes, every week, from the person running your build.
Selections, approvals, and open items in writing, so nothing lives in someone's memory.
A direct line to Seb. You never chase a subcontractor for an answer.
What owners ask most about building or renovating a home with Sebby Homes in Dallas–Fort Worth.
Sebby Homes builds custom luxury homes across Dallas–Fort Worth, Texas, including Highland Park, Preston Hollow, University Park, Southlake, Westlake, Uptown, and Knox–Henderson. As a design-led custom builder rooted in DFW, we know the lots, neighborhoods, and permitting in each of these communities.
Yes. Sebby Homes builds custom homes on your lot anywhere in the Dallas–Fort Worth area. The process starts with a conversation and a walk of your site, where we read the land together before design begins.
Sebby Homes is a design-led custom builder with single accountability (one builder, one schedule, one point of contact), not a production builder working from fixed floor plans. Architecture, interiors, and budget are resolved together before construction, and the finish is held to a standard of flush reveals, aligned grain, and shadow-gap millwork.
A custom home from Sebby Homes typically takes about 14 to 24 months from first design to handover, depending on the size of the home, the complexity of the site, and city permitting. The five stages are Design, Preconstruction, Build, Finish-Out, and Handover.
Custom home pricing with Sebby Homes depends on the lot, the size of the home, and the level of finish, and it is resolved transparently during design and preconstruction rather than quoted from a template. See our detailed breakdown of what it costs to build a custom home in Dallas–Fort Worth.
Sebby Homes follows a five-stage process: Design (architecture, interiors, and budget as one), Preconstruction (engineering, permits, and selections), Build (disciplined site leadership with weekly owner updates), Finish-Out (the invisible craft of millwork, systems, and light), and Handover (final walkthrough, systems training, and warranty care). Clients follow every step through the six9 Builder client portal.
Both. Seb Pessy came up remodeling before building new custom homes, and Sebby Homes renovates kitchens, primary suites and baths, additions and second stories, whole homes, wine cellars, and backyards and front yards across Dallas–Fort Worth, held to the same standard as its new construction.
On most kitchen, bath, and suite projects, yes. The work area is sealed off, and you know which rooms stay usable, and when water and power are off, before demolition starts. On whole-home remodels Sebby Homes tells you up front if moving out for part of the job is the better call.
Sebby Homes shows it to you before anything is covered back up, with photos in your six9 Builder client portal, and agrees the fix and its cost with you in writing before the work continues. Finding those problems is the point of opening the walls.
Yes. Sebby Homes builds outdoor kitchens, covered patios, hardscape, landscape, entries, walkways, and driveways across Dallas–Fort Worth, with the same team and the same standard as the house itself.
To start a custom home or renovation project with Sebby Homes, contact founder Seb Pessy at 469-996-3789 or seb@sebby.homes. The first step is a simple conversation, followed by a walk of your lot or, for a renovation, a walkthrough of your house in the Dallas–Fort Worth area.
The next step is simply a conversation about your site or your house, your program, and what you have in mind.
Your vision, your timeline, our approach.
We meet on your lot and read the land together.
Architecture, interiors, and budget, as one.