Bathroom Remodels

Bathroom remodels, built like new construction.

Sebby Homes remodels primary suites and bathrooms in homes across Dallas–Fort Worth, from a dated hall bath to a primary bath rebuilt around a freestanding tub.

  • Tile, glass, stone, and fixtures designed as one piece
  • Waterproofing done before tile, not hoped for after
  • One builder of record for the design, the trades, and the finish
Plan your bathroom 469-996-3789
After: primary bath with a freestanding tub, lit wall niche, floating vanities with black stone tops, backlit mirrors, and a black-and-white geometric tile floor
Before: primary bath with striped wallpaper, oak vanities, and a tiled corner jetted tub

Primary Bath · Dallas–Fort Worth

A tiled corner jetted tub and oak vanities replaced with a freestanding tub, a lit niche, floating vanities with black stone tops, backlit mirrors, and a geometric tile floor.
Drag to compare
Another Bath

From dated tile to a bath that fits the house.

Yellow wall tile and a wall-hung sink replaced with large-format marble-look tile, a double-sink vanity, and a mosaic backsplash. Seb is on site through the build, and the person who walks the space with you is the person who answers for it.

Start with a walk of your bath
After: bathroom with large-format marble-look tile, a double-sink vanity with dark drawers, and a mosaic backsplash
Before: bathroom with yellow wall tile, a wall-hung green sink, and an octagon mosaic floor

Bath Remodel · Dallas–Fort Worth

Yellow wall tile and a wall-hung sink replaced with large-format marble-look tile, a double-sink vanity, and a mosaic backsplash.
Drag to compare
What we build

Baths that fit the house.

01

Primary Baths

Freestanding tubs, walk-in showers, double vanities, and the lighting and storage around them.

02

Hall & Guest Baths

Dated tile, fixtures, and vanities replaced with finishes that match the rest of the house.

03

Tub to Shower

A tub swapped for a walk-in shower, or a jetted tub for a freestanding one, with the drain and floor checked first.

04

Primary Suites

A bath remodeled with the bedroom and closet, built at the same time and finished to the same standard.

How it gets built

The part you see depends on the part you don't.

01

Design

Layout, tile, glass, vanities, and lighting are drawn together, with drain locations and the shower layout settled early.

02

Rough-in

Plumbing, drains, venting, and the shower waterproofing go in while the walls are open, before any tile is set.

03

Finish

Tile, glass, stone, and fixtures go in last, aligned to the room, with the same eye for detail as our custom homes.

Questions

Before you plan one.

Can a tub become a walk-in shower?

Often, yes. What matters is where the drain can go, how the floor is framed, and how the glass fits. We look at that on a walk of the house before anything is drawn.

What happens behind the tile?

The shower is waterproofed and the drains and venting are set before any tile goes on. It is the part you won't see once the room is finished, and the part that decides how it holds up.

Can a bath remodel be part of a larger renovation?

Yes. Baths are often remodeled with the primary suite or a whole-home renovation, and doing it at the same time means the walls are opened once.

Next Step

Tell us about your bathroom.

A few details are enough to start, and an email or a phone number, whichever you prefer. Seb reads every message and replies personally, usually within one business day.
Prefer to talk now? Call 469-996-3789 or email seb@sebby.homes.